cancel
Showing results for 
Search instead for 
Did you mean: 
Laurence7
Occasional Member - Level 2

Change the posting date

Hello,

How can I change the posting date in SAP or Concur.

The reports are uploaded on the first 2 days of each month but the posting date should be the last date of the previous month. Is there a way to adapt the posting date in Concur or SAP?

Kind regards,

Laurence

1 REPLY 1
rwingerd
Super User
Super User

There are standard options in SAP CTE_SETUP to define the posting date, but not the option you are looking for. You may want to take a look at the available BADIs or User Exits to see if there is a way to customize the posting process to override the configuration in CTE_SETUP.